Ordonnancement d’un atelier sériel hybride et flexible (Scheduling hybrid flexible flowshop problem)
Avec réglages dépendants de la séquence des travaux (with Sequence Dependent Setup Times)
Objectif: Minimisation du retard total (minimizing total tardiness)
Instances:
- Description des instances (.pdf)
- ProblemDataSet (.zip)
Paper:
- Sioud, A., Gagné C., Gravel M., Minimizing Total Tardiness in a Hybrid Flexible Flowshop with Sequence Dependent Setup Times, The Fourth International Conference on Advanced Communications and Computation (INFOCOMP 2014), Paris, France, July 20-24 2014.